Show/Hide Toolbars

HOMER Grid 1.9

Navigation: Results > Summary Mode > Summary Types

Summary With No Feasible Solutions

Scroll Prev Top Next More

HOMER Logo


If there are no feasible solutions, view some of the possible tips and considerations listed below.

Check the calculation report to get information on how many simulations were run, and why they were deemed infeasible

Look through the model for constraints that might have filtered out the simulations as infeasible. Some of the reasons could be:

a. Load not served during outages due to insufficient power supply from other resources such as solar/battery/wind/generators
b. Penalties on emissions, as shown in Emissions below

clip0008

 

 c. A high minimum renewable fraction in your Project Economics

clip0009

 

 

 

 

The Homer Support site has a searchable knowledgebase and additional support options. HOMER Online contains the latest information on model updates, as well as sample files, resource data, and contact information.UL LLC © 2022